Project / T425-SIM

T425-SIM

In test

Overall project status: IN_TEST. A closed subsystem checkpoint does not establish complete T425 compatibility.

T425-SIM · PUBLIC SOURCE

Functional sources published

The functional T425-SIM snapshot is available on GitHub, including the microprogrammed CORE, LINKUSB, IServer, VM and the Control Center carried in the published history.

8b8ecb38e19734fecce09f24c40ef651484db208

Open source on GitHub ↗
F161-FIX19 · EXPERIMENTAL PASS

Milestone — authentic Hello World (28 October 2026)

An isolated experimental microprogrammed CORE ran the authentic 3,267-byte boot file and printed Hello world... to stdout through a host-side SP_PUTS service. The test completed the host response, architectural RX and SP_EXIT with CPU_ERROR=0.

  • Authentic boot image: 3,267/3,267 bytes consumed
  • Natural SP_PUTS frame: 24 bytes; literal Hello world... printed once to stdout
  • Host response 01 00 00; two architectural RX commits (2 + 1 bytes)
  • Natural SP_EXIT frame: 8 bytes; 32 TX bytes and 32 harness ACKs in total
  • Runner exit status 0; directed regression tests passed

Scope: experimental F161-FIX19 harness only. ACKs were simulated by HARNESS_PEER, not measured on the physical PHY. F36/F45/F98 CORE changes are not promoted to the canonical tree; Rev.C equivalence and production ISERVER integration remain under review.

29 OCT 2026 · macOS TERMINAL · REPRODUCED EXPERIMENTAL RESULT

Result reproduced in Terminal

Direct execution of the already compiled experimental T425-SIM simulator in Docker on macOS. The output below was observed during the actual run, not printed by an echo command.

F99_HOST_REQUEST_RECEIVED event=1 endpoint=0 length=24 hex=16000f010000000e0048656c6c6f20776f726c642e2e2e71
Hello world...
F99_HOST_REQUEST_RECEIVED event=2 endpoint=0 length=8 hex=060023ffc99a3b0e
F101_SERVICE_TERMINATE event=2 frame_validated=1 exit_status=0 response_emitted=0

Partial, reproducible result: SP_PUTS (24 bytes), Hello world... output, and SP_EXIT (8 bytes, status 0) in the experimental harness with simulated ACKs. This does not validate the physical PHY, canonical CORE, or full IMS T425 Rev.C equivalence.

F161-FIX21 · 29 OCT 2026 · ARCHITECTURAL REVIEW

Canonical integration status

The post–Hello World documentary review preserves the experimental result but does not authorize promotion of the deltas into the canonical CORE.

  • F28 — already present in the canonical CORE; no reapplication.
  • F36 — blocked: functional divergences in UNPACKSN/NORM; not safe as a global rule.
  • F45 — blocked: strobe/commit contract and NEXTMPC divergence at 0x0A2 remain unresolved.
  • F98 — blocked: physical Rev.C Next/clear contract and isolated validation remain open.

Next workstream: plan SP_PUTS/SP_EXIT integration in VM/ISERVER, without embedding the harness in the CORE or changing the PHY.

Architectural baseline

The project keeps an explicit separation between the conceptual processor path and platform-specific transport. The map is an audited architectural path, not a claim of complete compatibility.

Processes express intent and exchange messages.

Audited architectural path

The documented baseline includes the following architectural areas. This list is evidence of an audited path, not proof of a complete IMS T425 implementation.

  • Instruction/opcode and OReg processing
  • CROM entry
  • 118-bit MIR
  • Datapath
  • Condition selection
  • NEXTMPC / microsequencing
  • Scheduler/process semantics
  • Timers
  • Channel semantics

CORE ↔ Link Service ↔ PHY

The boundary assigns responsibility without collapsing architectural semantics into hardware details.

CORE

Architectural channels, WAIT/TAKE, process state, scheduler and architectural IN/OUT.

LINK SERVICE

Transport abstraction and endpoint routing between logical processor/channel behavior and physical transport.

PHY

PIO/FIFO/IRQ/DMA mechanisms where applicable, physical per-link state, token/event attribution and physical DATA/ACK behavior. Physical ACK remains PHY-local.

Validated PHY checkpoint

The project documentation records this PHY checkpoint as validated. It is deliberately narrower than the overall project status.

  • Four full-duplex physical links
  • Two PIO state machines per link; eight PIO state machines total
  • Endpoint 0..3 maps to architectural Link0..3 only at the CORE-PHY seam
  • Physical ACK per DATA byte remains PHY-local
  • One outstanding DATA byte per direction
  • Outgoing ACK bypasses DATA wait
  • Portable CORE has no RP2040/PIO/DMA/GPIO dependency
  • RX admission is controlled by CORE architectural state
  • External IN lifetime is explicit
  • Multibyte RX credit is rearmed one byte at a time
  • N+1 remains unaccepted/unACKed until another architectural IN

Outside this checkpoint

The following remain outside the cited PHY validation and are future or still-open work:

Work outside the validated PHY checkpoint

  • VM
  • OCCAM execution and integration
  • Helios integration
  • Remaining system-service behavior not closed by the cited PHY work

System-service behavior not claimed by this checkpoint

  • Error / ErrorIn
  • Analyse / HaltOnError
  • EventReq / EventAck / EventWaiting
  • ProcSpeedSelect
  • DisableIntRAM